Skip to content
Quality & responsibility

Quality is a process,not a badge.

We do not publish certification logos or blanket quality claims. What we can describe honestly is how a Nine Yards programme is controlled: written buyer requirements, approved references, documented alignment before bulk, and checkpoints agreed with you in advance.

Audits & certification

Audit and certification requirements are confirmed programme by programme, based on your buyer requirements, the product and the destination market. We will tell you what a partner factory can evidence before you commit — and where it cannot.

The evidence chain

Define → Approve → Align →Inspect → Correct → Verify.

  1. 01Define

    Buyer specifications and agreed acceptance criteria

    Quality starts with what you define. We record your specification, measurement tolerances and acceptance criteria in writing, and work to that document rather than to an assumed standard.

  2. 02Approve

    Approved and sealed samples where applicable

    Where the programme calls for it, an approved sample is sealed and used as the physical reference for bulk. Deviations are raised against that reference, not against opinion.

  3. 03Align

    Documented pre-production alignment

    Before bulk starts, materials, trims, construction, labelling and packing are confirmed with the partner factory and shared with you, so everyone is working from the same brief.

  4. 04Inspect

    In-line and final checkpoints agreed per programme

    Checkpoints are scoped with you at the outset — what is checked, when, by whom and at what sampling level. We do not apply a single blanket inspection routine to every order.

  5. 05Correct

    Issues tracked through corrective action

    Where something falls outside the agreed criteria, it is documented, communicated to you, and followed through corrective action at the factory until it is resolved or a decision is agreed.

  6. 06Verify

    Partner-factory compliance scoped to buyer, product and market

    Compliance expectations differ by buyer, product and destination market. We scope what your programme requires and confirm what a partner factory can evidence for it.

Band A

Before bulk

Specification recorded, materials and trims confirmed, sample approved and sealed where applicable, acceptance criteria written down and pre-production alignment documented with the partner factory.

Band B

During bulk

The checkpoints scoped for your programme are run at the agreed points and sampling level, findings are reported to you, and anything outside the agreed criteria is followed through corrective action.

Band C

Before shipment

Finished goods are checked against the approved reference and the agreed criteria, and packing, labelling and documentation are confirmed before departure is scheduled.

Acceptance, written down

Criteria beforeopinions.

Acceptance wording is written per programme with you. The sheet alongside shows the format we work in — it is an illustrative template, not a record of a completed inspection.

FORM NY / QC-TEMPLATEIllustrative format

Programme acceptance record

Every line below is agreed with the buyer before bulk begins, so a finding at inspection can be measured against something written rather than argued.

Specification reference
Buyer specification / tech pack as supplied and confirmed in writing
Physical reference
Approved sample, sealed where the programme calls for it
Measurement tolerance
Agreed per point of measure with the buyer, across the size run
Checkpoint scope
What is checked, when, by whom and at what sampling level
Deviation handling
Documented, reported to the buyer, followed through corrective action
Sign-off
Buyer decision recorded before the programme moves to the next gate

Illustrative template only. Nine Yards does not publish inspection records, factory names or client documentation.

What we do not claim

Straight answers overmarketing language.

  • 01We do not own factories. Production runs at independent partner factories that we select and manage.
  • 02We do not publish certification marks or claim standards we cannot evidence for your specific programme.
  • 03We do not guarantee quality in the abstract. We work to criteria you have agreed in writing.
  • 04We do not present product visualisations on this site as factory, inspection or client evidence.

The earlier your quality, testing and compliance requirements are on the table, the fewer surprises there are at inspection. Send them with your brief.